AI data centers on industrial grid connections

GridSpan develops modular data centers beside operating steel mills and smelters, using grid capacity the plant already holds.

Prefabricated data center modules being installed on a concrete slab beside a substation Aisle of server racks inside a data hall

For plant owners

Equity and rental income from land and capacity you are not using, with no capital and no operating role.

For tenants

Powered data halls in 18 to 24 months, on sites with firm high-voltage supply.

For the grid

Batteries and flexible compute keep each site inside its contracted limit.

Execution

A new grid connection for a data center can take seven to ten years in Europe's main hubs. Heavy industry already holds those connections, often with capacity to spare.

  1. 01

    Find

  2. 02

    Secure

  3. 03

    Build

  4. 04

    Earn

Aerial view of a steel plant and its substation with modular data halls built alongside
Operating plant Modular data halls
One grid connection. Halls are added block by block as tenants sign.

Co-location

The data center uses capacity the industrial asset leaves free. Production follows the metal market as before.

Flexible load

Battery storage and workload software hold the combined site draw inside its grid limit.

Contact

We work with owners of steel, ferroalloy and base-metal plants that hold transmission-level grid connections.

Own or operate a site?

info@gridspanholdings.com